Cobalt Carbonate CAS#513-79-1
CAS Number: 513-79-1
Chemical Formula: CCoO3
Synonyms:
COBALT(II) CARBONATE, BASIC
COBALT (II) CARBONATE
cobaltcarbonate(1:1)
Appearance: Pink power
HS Code: 28369930
MOQ (Minimum Order Quantity): 1 FCL (Full Container Load)
Products Description of Hydroquinone CAS#123-31-9
Cobalt(II) carbonate, CoCO3, is a reddish paramagnetic solid and an intermediate in the hydrometallurgical purification of cobalt from its ores. It is an inorganic pigment, and a precursor to catalysts. Cobalt(II) carbonate also occurs as the rare red/pink mineral spherocobaltite. It is prepared by combining cobaltous sulfate and sodium bicarbonate solutions.
Parameters
Melting point | decomposes [KIR79] |
density | 4.13 g/mL at 25 °C(lit.) |
vapor pressure | 0Pa at 20℃ |
storage temp. | under inert gas (nitrogen or Argon) at 2-8°C |
solubility | insoluble in ethanol |
form | |
color | Pink |
Specific Gravity | 4.13 |
Water Solubility | Insoluble in water, alcohol and methyl acetate. |
Merck | 14,2436 |
Solubility Product Constant (Ksp) | pKsp: 12.84 |
Exposure limits | ACGIH: TWA 0.02 mg/m3 |
Stability: | Air sensitive. Incompatible with strong oxidizing agents. |
InChI | InChI=1S/CH2O3.Co/c2-1(3)4;/h(H2,2,3,4);/q;+2/p-2 |
InChIKey | ZOTKGJBKKKVBJZ-UHFFFAOYSA-L |
SMILES | C([O-])([O-])=O.[Co+2] |
CAS DataBase Reference | 513-79-1(CAS DataBase Reference) |
EPA Substance Registry System | Cobalt(II) carbonate (513-79-1) |
Safety Information
Hazard Codes | Xn |
Risk Statements | 22-36/37/38-40-43 |
Safety Statements | 26-36/37 |
WGK Germany | 3 |
TSCA | Yes |
HazardClass | 9 |
HS Code | 28369930 |
Hazardous Substances Data | 513-79-1(Hazardous Substances Data) |
Product Application of Cobalt carbonate CAS#513-79-1
The compound occurs in nature as the mineral cobalt spar or sphaerocobaltite. It is used in ceramics; in cobalt pigments; as a catalyst; as a temperature indicator; and in the preparation of other cobalt(II) salts. It also is added to soil to provide nutritional supplement in forage for cattle.
Factory and Equipment Show
Fast delivery time
Inventory 2-3 working days New production 7-10 working days


